Details: dismantling of flexible pavementsdismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per technical specifications clause 202 for rural roads of mord.(i) by manual meansb) granular courses (ii) by mechanical meansbituminous courses water bound macadam sub basewater bound macadam sub base by consolidating jhama metal / laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary,hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cuttingor filling and rolling all complete including the cost of all materials and hire and labour charges of all men an
Sector: PWD