Details: earthwork in excavation in all sorts of soils including, removing, spreading or stacking the spoils within a lead of 75m as directed including trimming the sides of trenches, leveling, and dressing and ramming the bottom, bailing out water etc. as required complete. (depth of excavation, not exceeding 1500mm). b) depth of excavation for additional depth beyond 1500 mm and upto 300 mm but not requiring shoring 150cm single soling including ramming and dressing bed to proper level and filling joints with powered earth or local sand including cost of materials.post for support cost of stone boulder 150mm north bengal variety plum concrete work with cement concrete with 30mm down graded stone metal 40% and stone boulder size 150mm and above placed in as directed, excluding shuttering if any (1:3:6) cement concrete (1:3:6) with 30mm down graded stone metal excluding shuttering with n.b variety stone metal.
Sector: District Administration