Details: excavation of soil for formation of cable trenches & re-instatement of the same cable trenches with the excavated soil as per instruction of site engineer. (for 4 run) excavation of soil by cutting metalled road/cement concrete/brick masonary/chequered plate/ paver block etc for formation of cable trench along with uprooting of protective cover in the existing trench & re-instatement of the same cable trench after of protective cover. laying of hdpe pipe(with 110mm diam. pe-80, pn-6) as per jack push method as per instruction of site engineer and as per site condition for laying of ug cable including supply of hdpe pipe as per is: 4984-1995 laying of hdpe pipe(with 110mm diam. pe-80, pn-6) as per microtunnelling method as per instruction of site engineer and excluding rate of cable laying & dressing. supply & laying of kiln-burnt 1st class brick having proper size & shape as per instruction of site engineer. cable laying & dressing of 11kv 3cx95sq.mm. xlpe cable in the excavated ca
Sector: Distribution