Details: sinking of sub-merhible with overhead tank earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a) depth of excavation not exceeding 1.50 m. filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level, and filing joints with powdered earth or local sand ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforceme
Sector: Zilla Parishad