Description: Rising Strengthening of Right Bank from Ch2651 to 2657 of RBMC Under Uchalan II Irrigation section of Seharabazar Irrigation Sub Division of Damodar Canal Division Name of Work Rising Strengthening of Right Bank from Ch2651 to 2657 of RBMC Under Uchalan II Irrigation section of Seharabazar Irrigation Sub Division of Damodar Canal Division
Details: Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc.as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction ofthe Engineer-incharge within a lead of,NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.C) Beyond 1.00 km and upto 2.00 kmMeasurement to be taken on the basis of pre- post work section measurement after deduction of void as per norms as directed by EIC Supplying, dressing and stacking at site bamboo pins above 5 cm.diameter and upto 7.5 cm. diameter. (Dia. to be measured at midlength). Driving bam
Sector: Irrigation