Details: cutting, uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by engineer-in-charge. supply of mazdoor (male). supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of engr-in-charge (cost is excludingthe cost of any types of filling materials).nb:- volume of earth/ sand filled bags should not be less than 0.028cum/ bag. dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. supplying, dressing and stacking at site bamboo pins above
Sector: Irrigation