Description: WBPHED EE JD e NIT 03 2025 26 Sl No 08 Name of Work Installation of 3 Three Nos Iron Elimination Plant IEP at Head Works Site 4th Tube Well Site and 5th Tube Well Site for Augmentation of Dakshin Chak Maulani Piped Water Supply Scheme in connection with Jal Jeevan Mission at Block Kranti under Jalpaiguri Division PHE Dte
Details: Name of Work Installation of 3 Three Nos Iron Elimination Plant IEP at Head Works Site 4th Tube Well Site and 5th Tube Well Site for Augmentation of Dakshin Chak Maulani Piped Water Supply Scheme in connection with Jal Jeevan Mission at Block Kranti under Jalpaiguri Division PHE Dte Supplying, Fabrication, on suitable RCC foundation and Commissioning with 3 (three) months Trial Run (including cost of routine testing of water sample for performance evaluation) of pressure type Iron removal plant as per design norms of the P.H.E. Dte. with necessary accessories viz. MS f
Sector: Water supply and Sewerage