Details: clearing compound premises of shurbs , plants jungles etc. by cutting and removing as directed (specific permission of e.i.c. prior to excution will be necessary) earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils with in a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the botttom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. (a) filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity).b) do by fine sand. single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with
Sector: Water supply and Sewerage