Details: earth work in excavation of foundation treches or derains in sort of soil (including mixed soil but exclulaterite or sandstone) including removing spreading or stackin the spoils within a lead of 75m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and remming bottom, balling outwater as required complete.depth of excavation not exceeding 1.500mm. earth work in filling in foundation trenches or plinth with good earth , in layers not exceeding 150mm. including watering and ramming etc. layer by layer compalete. ( payment to be made on the basis of measurment of finished quqntity of work) with earth obtained from excavation of foundation. single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. cement concrete with graded jhama khoa (30mm. size)(1:3:6) excluding suttering. brick work with 1st class bricks in cement mortar (1:4) (a) in foundation and plinth bric
Sector: Zilla Parishad