Details: operation of 5 nos. centrifugal pumps driven by 15/20 h.p. motor as and when required for 2 (two) shift daily and supply drinking water to jalasampad bhawan, salt lake, kol-91. (in all days throughout the period)(labour rates are inclusive of gst, cess, epf, esi, bonus & cp charges) 1 no pump operator/ day x 2 shift/ day x 365 days = 730 mandays (in all days throughout the period) 1 no helper/ day x 2 shift/ day x 365 days = 730 mandays (in all days throughout the period)
Sector: Irrigation