Details: earth work in excavation of foundation trenches ordrains, in all sorts of soil (including mixed soil butexcluding laterite or sandstone) including emoving, spreading or stacking the spoils within a lead of 75 m.as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. . single brick flat soling picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. cement concrete with 30mm down graded shingles excluding shuttering. (a) (6:3:1) proportion hire and labour charges for shuttering with centering and necessary stagingupto 4 m using approved stout props and thick hard wood planks of approvedthickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)25 mm to 30 mm shuttering without stagin
Sector: District Administration