Description: CIVIL WORKS Name of Work Construction of Library Building First Floor and Toilet Ground Floor at Pandaveswar College
Details: Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing within a lead of 75m as directed. Dismantling R.C. floor, roof, beams etc. Including cutting rods and removing as directed within a lead of 75 m. including stacking of steel bars.In ground floor including roof. Dismantling all types of masonary excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing as directed within a lead of 75m. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing as directed within a lead of 75 m. In ground floor including roof. upto 150 mm. thick Cleaning the concrete surface by removing dirt and debris, marking defective locations and removing loose concrete by careful stripping untill hard surface is exposed, cutting the concrete to regular shape, wire brushing the exposed surface and removing debris from site complete as per direc
Sector: Urban Authority