Details: earth work in excavation of foundation trenches ordrains, in all sorts of soil (including mixed soil butexcluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.asdirected. the item includes necessary trimming thesides of trenches, levelling, dressing and ramming thebottom, bailing out water as required complete.(a) depth of excavation not exceeding 1,500 mm.ref. page- 1, item -2, pwd sor vol-i w. e. f. 1.11.2017 supplying and laying polythene sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.ref. page- 47, item -3, pwd sor vol-i w. e. f. 1.11.2017 cement concrete with graded jhama khoa (30 mmsize) excluding shutering in ground floor and foundation.(a) 1:3:6 proportionref. page- 23, item -1, a) pwd sor vol-i w. e. f. 1.11.2017 hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood
Sector: Municipality