Details: earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. "earth work in filling in foundation trenches or plinth with good earth .in layers not exceeding 150mm including watering& ramming etc . layer by layer complete. a) with earth obtained from excavation of foundation." a) with earth obtained from excavation of foundation. cement concrete with 30mm down graded shingles excluding shuttering. (n.b variety) in ground floor-a) 1:3:6 proportion part-c pumping mechineries supply of ksb make cora 100 umai- 100 2c/30+ 1.50/22 2hp single phase submersible pump motor set. a) supplyinga & fitting 2.5 sq.m 3 core pv
Sector: Zilla Parishad