Details: earth work in excavation of foundation trenches or drains, in all sorts of soils (including mixed soil but excluding laterite or sandstone) i/c. removing, eading or stacking the spoils within a lead of 75 m as directed. the item includes necessary trimming the sides of trenches. levelling, dressing and ramming the bottom, bailing out water etc. as required complete. a) depth of excavation not exceeding 1500 mm. toilet colm a) filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed andconsolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) b) do by fine sand toilet block single brick flat soling of picked
Sector: PWD