Details: earth work in excavation for foundation trenches in all sorts of soil including removing spreading of staking the spoils within a lead of 75m as directed including trimming the side of trenches leveling, dressing and ramming the button, bailing earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 15cm including watering, ramming etc. layer by layer complete . single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and fitting joints with powdered earth or local sand. cement concrete with 30 mm down graded shingles excluding shuttering. n.b. variety (a) 1:3:6 proportion. cement concrete of mix (1:1.5:3) m-20 with 20m m. down well-graded stone chips excluding shuttering and reinforcement. hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and
Sector: Zilla Parishad