Details: hiring charges for necessary equipments like rope & pulley etc. along with necessary equipments for dismantling each odu from its position & lowering & repositioning the each unit from roof top to 1st floor [approx 10.8mtr] safely without damaging any parts etc. and deputation of manpower for lowering the out door units from roof top to 1st floor level for further installation (tools hiring charges + 8 nos semi-skill manpower @ 432 + 10 nos un-skill manpower @ 393 for 1 days [ 6000 + 7386, total rs.13,386.00 as per direction of eic [for 06 nos vrf odus] sub head-02 different electrical works associated to ac odu supplying and drawing 1.1 kv single core stranded 'fr' pvc insulated & unsheathed single core stranded copper wire (brand approved by eic) of the following sizes in the prelaid polythene pipe and by the prelaid gi fish wire and making necy. connection as required 4x126/0.4 (16 sqmm) + 2x80/0.4 (10 sqmm) as ecc laying of cable as below, on existing cable tray and binding wit
Sector: PWD