Details: labour for lowering and stacking after dismantling in parts r.s. joists, channels, angles, tees, plates etc.complete as directed.(a) from 1st floor level (b) from2nd floor level (b) from 3rd floor level welding in m.s. structural work with gas or electric:(a) tack weld (b) continuous weld ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant is codes.a) pakur variety supplying, spreading and consolidating stone dust to a depth of 100 mm and above at desired density and c.b.r. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks and depressions by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants complete as per specification. ( re
Sector: Water supply and Sewerage