Details: dismantling of damaged embeded part like guide channel/bottom seal beam/top runner of gates of distributories/branch canal/minor canal/channel from civil structure as directed by the engineer-in charge.the cost of man power employed for dismantling and hire charges of tools and plant, scaffolding charges etc. payment will bemade on actual length of guide channel replaced. dismentling of hoisting system consisting of gear/ rod, padestal stool, top plate, bottom plate, g.m/c.i bush, operating wheel etc for repairing/replacement of gates and staking suitable place or as per direction of e.i.c. the cost includes cost of man power employed for dismantling, hire charges of tools & tackles, scaffolding and safety equipments etc including carriage loading & unloading. taking out old existing unservicable damaged gate shutter of canal/river completely after disengaging from hoisting system completely for installation of new gate shutter. the work includes cutting of gates into suitable pie
Sector: Irrigation