Description: Soil investigation in connection with No cost to the State Exchequer project over River Pagla for a length of 19 0 KM in Block Kaliachak I and III under Malda Irrigation Division Name of Work Soil investigation in connection with No cost to the State Exchequer project over River Pagla for a length of 19 0 KM in Block Kaliachak I III under Malda Irrigation Division
Details: Mobilisation Charges of all tools & Plants along with accessories, material, labour, supervision etc. at site of work required in connection with boring and testing work, including setting up boring rigs and shifting to different Bore-hole points etc. and also including withdrawal of same from the site after completion of work, complete as per direction of Engineer-in-Charge.Preliminary Investigation 01 NosNote: Payment will be made after successful completion of work. Labour for boring by sinking and finally withdrawing 50mm to 100mm dia. (internal) pipe by a standar method to any depth below ground level / bed level in all types of soil like clay, silt, sand, stiff clay, mixed soils etc. except rocks, including collection of disturbed soil samples and including preparation and submission of bore-log as per standard proforma and also including hire charges of tool and plants complete as per direction of Engineer-in- Charge.(i) Depth 0 m to 10 m metre Laboratory Investigation:Liquid L
Sector: Irrigation