Details: earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. filling in foundation of plinth by fine sand in layers not exceeding 150mm as directed and consolidating same by thorough saturation with water ramming complete including the cost of supply of sand. removal of , earth etc. from the working site and disposal of the same beyond the compound , in conformity with the municipal/ corporation rules for such disposal, loading into truck and cleaning the site in all respect as per direction of the e.i.c. ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any
Sector: Municipality