Details: foot slab over ditch excavation for structuresearth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the engineer-in-charge . i. in all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth ii) with pumping out water excluding shoring supplying, spreading and compacting sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary hire
Sector: District Administration