Details: earthwork in excavation in the canals / drainage channels / borrow pits /river bed / of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the engineer-in-charge.(b) gravel / moorum / kankar / compact moorum / very much weather rock / sticky soil mixed with moorum / soil mixed with shingles. extra rate over item no 1.00 for a lead of 50m or part there of beyond initial lead.4 (four) nos. extra lead extra rate over item nos.1.00 for all kinds of soil for every additional lift of 1.50 metre or part thereof beyond the initial lift of 1.50 metre.1 (one) extra lift cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30cm. girth including removing as directed by engineer-in-charge
Sector: Irrigation