Details: clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (specific permission of engineer-in-charge prior to execution will be (payment to be made on area cleared)necessary). earthwork in excavation in all sorts of soils including removing trimming the sides of tranches leveling, dressing and of stacking spoils with a lead of 75 m as direction including ramming the bottom bailing out balance water etc required complete depth of excavation not exceeding earthwork in filling in foundation trenches or plinth with good earth in layers not exceeding 15 cm including watering and ramming etc. layer by layer complete. ( payment to be made on the basis of mesurement of finished quantity of work) supply of stone boulder (n.b. variety) of approved quarries above 150 mm to 200 mm dia size. providing & labour for laying 150 mm. to 200 mm.boulder soling including rough dressing hand packing andramming down small pieces in the interstics includingrolling and pr
Sector: District Administration