Description: WBPHED EE JD e NIT 34 2024 25 Sl No 12 Name of Work Balance work for Laying Distribution System at Baragharia Piped Water Supply Scheme in connection with Jal Jeevan Mission at Block Dhupguri under Jalpaiguri Division PHE Dte
Details: Name of Work Balance work for Laying Distribution System at Baragharia Piped Water Supply Scheme in connection with Jal Jeevan Mission at Block Dhupguri under Jalpaiguri Division PHE Dte Supplying HDPE (Materials grade PE-100) pipes conforming to IS 4984-1995 with latest revision & amendments if any with necessary HDPE specials (excluding cost of CIDF valves) including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder,road sub-grade an
Sector: Water supply and Sewerage