Details: design, supplying, fabrication, commissioning including 3 (three) months trial run of 25m3hr. capacity pressure type iron elimination plant with construction of blower room backwash water disposal at head work site of purbabinodpur water supply scheme of gazole block under malda division p.h.e dte in the district of malda. (2nd call)
Sector: Water supply and Sewerage