Details: design, supplying, fabrication, commissioning including 3 (three) months trial run of 40m3hr. capacity pressure type iron elimination plant with construction of blower room backwash water disposal at head work site of uttar kumedpur water supply scheme of harishchandrapur-ii block under malda division p.h.e dte in the district of malda. (2nd call)
Sector: Water supply and Sewerage