Details: earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the engineer-in-charge .i. in all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. upto 3 m depth.without pumping out water and shoring. supplying and laying polythene sheet (150 gm/sqm ) over damp proof course or below flooring or roof terracing or in foundation trenches. ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant is codes. pakur variety. making filter with well graded 40 mm down ballasts and laying uniformly behind weep holes, below pitching on bed, side slopes including supply and carr
Sector: Irrigation