Details: earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (a) with earth obtained from excavation of foundation. rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site(b) in fine dressed work in building single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. (ii) cement concrete with 30 mm down graded shingles excluding shuttering.
Sector: District Administration