Description: WBPHED AE BSSD NIeT 09 24 25 8 Name of Work Rising main Connecting line DI K9 from CWR to OHR at head work site under Piped Water Supply Scheme for Khoyrasole Zone II Khoyrasole Block under Birbhum Sadar Sub Division P H E Dte within Birbhum Division PHE Dte Sl No 08 Name of Work Rising main Connecting line DI K9 from CWR to OHR at head work site under Piped Water Supply Scheme for Khoyrasole Zone II Khoyrasole Block under Birbhum Sadar Sub Division P H E Dte within Birbhum Division PHE Dte Sl No 08
Details: Name of Work Rising main Connecting line DI K9 from CWR to OHR at head work site under Piped Water Supply Scheme for Khoyrasole Zone II Khoyrasole Block under Birbhum Sadar Sub Division P H E Dte within Birbhum Division PHE Dte Sl No 08 Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the within a lead upto 75 m as directed. Carrying CI/DI pipes with specials and valves and lowering placing in position and laying carefully inside the tren
Sector: Water supply and Sewerage