Details: mobilisation charges of all tools & plants along with accessories, material, labour, supervision etc. at site of work required in connection with boring and testing work, including setting up boring rigs and shifting to different bore-hole points etc. and also including withdrawal of same from the site after completion of work, complete as per direction of engineer-in-charge.a) preliminary investigation road & bridge workslabour for boring by sinking and finally withdrawing 50mm to 100mm dia. (internal) pipe by a standard method to any depth below ground level / bed level in all types of soil like clay, silt, sand, stiff clay, mixed soils etc. except rocks, including collection of disturbed soil samples and including preparation and submission of bore-log as per standard proforma and also including hire charges of tool and plants complete as per direction of engineer-incharge a) depth 0m to 30m a. laboratory investigation:
Sector: Irrigation