Details: construction of pifa 136 wds cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by engineer-in-charge. earth work in excavation in ordinary soil / mixed soil i.e. clay mixed with moorun , kankar, pebbles / silt dry or moist / slushy silt / sticky soil for wds / whs / reservoir / sfmis etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1000 m including spreading , leveliing disposed spoils at disposed area. 100 % of total earth cutting volume compaction of earthwork in embankment by watering rolling with sheep foot roller or loaded truck in layers of 25cm as per direction of the engineer-in - charge earth work in filling in pond including ramming dressing all complete supply
Sector: Water Resource Department