Details: earth work in excavation for foundation trenches in all sorts of soil including removing spreading of staking the spoils within a lead of 75m as directed including trimming the side of trenches leveling, dressing and ramming the buttom, bailing out water as required complete. (a) depth of excavation not exceeding 1500 mm. earth work in filling in foundation trenches or plinth with good earth in layers not execeeding 15cm including watering, remming etc. layer by layer complete. (a) with earth obtained from excavation of foundation filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by through saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) for foundation filling single brick flat soling of picked jhama bricks including ramming and dressing bed to proper leveling and filling joints with powdered earth or local sand in ground floor (ii)
Sector: District Administration