Details: name of work construction of boundary wall at head works site of uttar bhuskadanga piped water supply scheme in connection with jal jeevan mission at block maynaguri under jalpaiguri division phe dte boundary wall earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches
Sector: Water supply and Sewerage