Details: box cutting or filling in road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of engineer-in-charge including uprooting and removing plants and jungles when and where necessary. upto 150.00 mm removal of unserviceable soil with disposal upto 1000 metres removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per technical specification clause 302.3.11 for rural roads of mord. (mode of measurement: pre works and post works) supplying, spreading and compacting sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction including including lighting,
Sector: Urban Authority