Details: earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m(mode of measurement: pre works and post works)(ii) in mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) construction of sub base using local materials, spreading in uniform layers with motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per clause 401 of specifications for road & bridge works of mort&h (5th revision). (i) for construction of sub base by compacting 1st class brick aggregates (40 mm down) and sand (in proportion of 60:40) water bound macadam base course - ( grading-i )
Sector: Water supply and Sewerage