Details: designing, supplying, febrication, on suitable rcc foundation, commissioning with 3(three) months trial run (including cost of routine testing of water sample and flow/hr for performance evaluation) of pressure type iron removal plant as per design norms of cpheeo(latest) with necessary accessories for dulehpur water supply scheme at karandighi block under raiganj division, p.h.e. dte. dist:- uttar dinajpur, capacity- 100 m3/hr. add gst @ 18% add labour welfare cess @ 1%
Sector: Water supply and Sewerage