Details: earthworks earthwork in excavation in the canals / drainage channels / borrow pits / river bed / of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the engineer-in-charge.ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. extra rate over item nos.1.01 for all kinds of soil for every additional lift of 1.50 metre or part thereof beyond the initial lift of 1.50 metre. protection works quarrying, carrying, & supplying stone boulders / shingles etc. from quarry site selected by the engineer-in-charge to the site of work including cost of materials,loading unloading and carriage including all incidental charges like royalty and labour charges for laying boulder/ shingles in apron
Sector: Irrigation