Details: earth work in excavation of foundation trenches or drain in all shorts of soils (including mixed soil but excluding latrine or sand stone ) including removing , spreading or staking the spoils within a lead of 75 m as directed.the item including and ramming the bottom. balling out water as required complete.(a) depth of excavation not exceeding 1.5 m. earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (a) with earth obtained from excavation of foundation. filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. b) do - by fine sand single brick flat soling of picked jhama bricks including ramming and dressing bed p
Sector: Zilla Parishad