Details: earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the engineer-in-charge .(a) depth upto 3 m.iv) without pumping out water and shoring construction of subgrade and earthen shouldersconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1 for rural roads of mord. (pre work post workmeasurement)b) carriage upto total lead of 3.00 km construction of subgrade and earthen shouldersconstruction of subgrade and earthen shoulders with approved material obtaine
Sector: Urban Authority