Details: building work:earth work in excavation for foundation trenches in all sorts of soil including removing spreading of staking the spoils within a lead of 75m as directed including trimming the side of trenches leveling, dressing and ramming the button, bailing .a) depth of excavation not exceeding 1.5m earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 15cm including watering, ramming etc. layer by layer complete .a) with earth obtained from excavation of foundation. (a) filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)(b) do - by fine sand single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and fitting joints with powdered earth or local sand. (i) cement concrete with graded stone balla
Sector: Urban Authority