Details: wood work in beams and burgahs fitted and fixed in position complete. (cost for repairing of damage to be paid separately) ii) sal : malayasian supplying, fitting and fixing boiling water proof ply conforming to is: 710-1977 bonded with phenol formaldehyde synthetic resin conforming to is: 848-1974 of approved make and brand fitted and fixed as per design as per approval and direction of engineer-in-charge. [excluding the cost of supporting frame work and teak wood batten/lipping] first floor (iv) 12mm supplying, fitting and fixing boiling water proof ply conforming to is: 710-1977 bonded with phenol formaldehyde synthetic resin conforming to is: 848-1974 of approved make and brand fitted and fixed as per design as per approval and direction of engineer-in-charge. [excluding the cost of supporting frame work and teak wood batten/lipping] first floor (vi) 19mm supplying fitting, fixing decorative lamination conforming to is: 2046 : 1995 as per approved make, brand, finish and thickn
Sector: Road development