Details: box cutting or filling in road embankment in all sorts of soil including spreading the spoils properly over the flanks as necessary or on berm to approximate grade & camber and rolling the sub grade with power roller to proper camber and grade as per direction and satisfaction of engineer - in charge including uprooting and removing plants and jungles when and where necessary. [depth upto 150 mm ] sand filling in foundation trenches and at the back of aboutments , wing - walls etc. with good local sand free from earth in layers not exceeding 15 cm. including each layer by profuse water and poking and ramming layer by layer complete including supply of sand. quality of sand is to be approved by the eic. by fine sand single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand . hire & labour charges for shuttering with or without staging upto 4.0 m height using approved stout prop with wooden plank/ ply / wood / s
Sector: Urban Authority