Description: Construction Installation bituminous Speed Beaker along with traffic signage at chainage 2 40Km 3 10Km and 12 90Km of Basirhat Swarupnagar Road under Basirhat Highway Sub Division of Barasat Highway Division No I in the dist of North 24 Parganas Name of Work Construction Installation bituminous Speed Breaker along with traffic signage at chainage 240Km 3 10Km and 12 90Km of Basirhat Swarupnagar Road under Basirhat Highway Sub Division of Barasat Highway Division No I in the district of North 24 Parganas
Details: Repairing -holes and making up small depressions with ramming or power rolling including screening, cleaning chips or metals and washing, drying as necessary and heating the chips or metal where necessary, cutting holes to regular shapes with vertical edges, cleaning the disintegrated materials, heating matrix and applying tack coat (including sides), finishing the top of repaired surface levelled with adjoining area, including cost and carriage of stone aggregates and matrix, including cost of applying tack coat.i) With premixed Chips or Bajrees with 54 kg of bitumen per m3 of loose net volume of stone chips using concrete mixer machine. (The payment is to be made on the basis of loose net volume of stone materials consumed in the work).(b) Using Mobile HMP (Light duty). Open-Graded Premix Surfacing using Bituminous (Viscosity grade Paving Bitumen / Modified bitumen) Binder and Mobile Hot Mix Plant (Light Duty).Providing, laying and rolling of Open - graded premix surfacing of 20 m
Sector: PWD