Details: box cutting or filling in road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of engineer-in-charge including uprooting and removing plants and jungles when and where necessary.(a) depth up to 150 mm. construction of sub base using local materials, spreading in uniform layers with motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, lighting,guarding and barricading including cost andcarriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per clause 401 of specifications for road & bridge works of mort&h(5th revision).(iv) for construction of sub base by compactingriver bed mate
Sector: Zilla Parishad