Details: box cutting or filling in road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of engineer-in-charge including uprooting and removing plants and jungles when and where necessary. upto 600.00 mm box cutting or filling in road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of engineer-in-charge including uprooting and removing plants and jungles when and where necessary. upto 150.00 mm removal of unserviceable soil with disposal upto 1000 metres removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall b
Sector: Urban Authority