Details: earthwork in excavation for foundation of structuresupto 3 m depth as per drawing and technical specification clause 1104 for rural roads of mordincluding setting out, construction of shoring andbracing, removal of stumps and other deleteriousmatter, dressing of sides and bottom and backfillingwith approved material. sand filling in foundation trenches and at the backof abutments, wing-walls etc. with good local sandfree from earth in layers not exceeding 15 cm.including inundating each layer by profuse waterand poking and ramming layer by layer completeincluding supply of sand. quality of sand is to beapproved by the engineer-in-charge. rate analysis attached supplying & laying polythene sheet hire and labour charges for shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, c
Sector: Zilla Parishad