Details: item no-1::supplying, spreading and compacting rbm to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, arricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. item no-2::supplying and laying polythene sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. item no-3::cement concrete (1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any. item no-4::hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting,
Sector: Zilla Parishad