Details: item no:-1::item. no 2(b) /page- 10 of 315 ( building works schedule ):-dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing as directed within a lead of 75 m. in ground floor including roof. (b) above 150 mm. thick item no:-2::item no-2.13-b, p-231:-removing all types of hume pipes and stacking within a lead of 1000 m including earthwork and dismantling of masonry works as per technical specification clause 202 for rural roads of mord.(b) above 600 mm to 900 mm dia hume pipe item no:-3::page no-276,item no-12.01/i/a:-earthwork in excavation for foundation of structures as per drawing and technical specification including setting out, removing, spreading or stacking of spoils within a lead of 150m as directed and including triming the sides of the trenches, leveling, dressing and ramming the bottom, complete as per direction of engineer - in - charge in all sorts of soil excluding marshy soil & rocks (soft or hard) by manual mean
Sector: Zilla Parishad