Details: earth work in excavation of foundation trenches or drains, in all shorts of soil (including mixed soil but excludinglaterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 meter as directed.the item includes necessary trimming the sides of trenches, levelling,dressing and ramming the bottom, bailing out water as required complete. depth of excavation not exceeding 1.50 m . filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. supplying and laying polythene sheet (150gm/sqm) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. hire and labor charges for s
Sector: Urban Authority